Execution of Egyptian Stock Exchange Building B-135 ,Smart Village.the building consists of:- tow reinforcement concrete structure Skeleton which crossed by road at ground level and connecting by steel structure bridge at second and third floor level.
Owner /Egyptian Stock Exchange - Consultant / ECG
General Buildings/Adminsterative
Smart Village ,6 October City, Cairo
Administrative Building on an area of 7,000 m2, it consists of basement, ground, first, second, and roof floors with high quality finishing, on a total built area of 31,400 m2. It is a building for both administrative and educational purposes.
Owner / Ministry of Telecommunications- Consultant / Segman
General buildings / Administrative
El Sheikh Zayed
Ended in 2008
It consists of five floors (basement, ground floor, and 3 typical floors) with a total shaded area of 9,000 m2 There are two towers linked with a steel bridge with aluminum and poly carbonate cover The project includes all Electromechanical, Infrastructure, and Landscape works
Owner / Ministry of Telecommunications - Consultant / ECG
general buildings/ Administrative
Smart Village , Giza , Egypt
Ended in 2009
The building consists of basement, ground, first, second and roof floors with a total shaded area of 3,500 m2. The project includes all Electromechanical, and Infrastructure works • Electrical, HVAC, fire alarm & fire fighting systems, elevators, water supply works, and sewage works.
Frensh embassy in Arab rebuplic of egypt
General buildings / Administrative
Zamalek , Cairo
Ended in 2007
Construction of Raya office building in smart village. • The building consists of two basements, ground floor and three typical floors with a total shaded area of 7,000 m2 and high quality finishing. The project includes all Electromechanical, and Infrastructure works • Electrical, HVAC, fire alarm & fire fighting systems, elevators, water supply works, and sewage works.
Owner / Raya Holding Company- Consultant /ECG
General buildings / Administrative
Smart Village
Ended in 2005
Construction of Administrative Building on an area of 4260 m2, It consists of 3 basements 4260 m2 each, ground and first floor 2920 m2 and roof rooms 300 m2 plus fauces Works, electric rooms, gate rooms, water tanks
Owner / Union of Arab Academies - Consultant / Dr. Hewaedy
General buildings / Administrative
the 6th of October
Ended in 2015
The building consists of five floors (basement, ground floor, and 3 typical floors) with a total shaded area of 14,400 m2. The project includes all Electromechanical, Infrastructure, and Landscape works: • Electrical, HVAC, fire alarm & fire fighting systems, elevators, water supply, sewage, planting and irrigation works
Owner /Ministry of Telecommunications- Consultant / Dr.Amr
General building / Administrative
Smart Village
Ended in 2005
Construction of Administrative Building on an area of 7275 m2, It consists of 3 basements 7000 m2 each, ground 2200 m2 , 6 typical 1700 m2 each , and roof rooms 300 m2 , on a total built area of 35,000 m2
Owner / Industrial Development bank - Consultant / Dr.Amr
General buildings / Administrative
The 5th District
Ended in 2015
Construction of a very high standard building, consists of chairman office , meeting rooms , conference & lecture halls , ....... etc
Owner / AKHBAR ELYOM Institute - Consultant / Sabour Office
General buildings / Administrative
The 6th of October
Ended in 1998
Construction of the New Terminal (No.3) at Cairo International Airport. The Project consists of: • 343 linear meters of steel molds which are used to execute 9,900 structural pre-cast beams. • Pre-cast beams which are installed to form 5 floors of the Airport with a total area of 10,000 m2. • 13 tower cranes, 5 mobile cranes and 2 gantry cranes which are used to produce and install pre-cast units.
Owner / Egyptian Airports company TAV-HOL .Comp.jv
General buidings / Airports
Cairo Airport
Ended in 2006
The project consists of the following concrete works: - The New Terminal Halls with an area of 45,000 m2. It consists of three halls; arrival hall (two levels), middle hall (four levels) and departure hall (two levels). - The services buildings. The works include the buildings, electromechanical works, sewerage treatment plant and the security rooms. • The concrete roof has been executed by (TROUGHED SLAB) for the area of 20,000 m2. • The concrete walls have been executed with a height of 33 m. • The pillars, foundations and roofs have been executed for all project items. • The project floors have been executed within an area of 50,000 m2, including especially reinforced concrete floors
Egyptian Airports company Saudi Binladen Group
General Buildings / Airports
Sharm El-Sheikh International Airport
Ended in 2006
Three main complexes with a total shaded area 42000 m2 including service area (main kitchen, laundry, stores, morgue,...etc). • Administrative Area Total shaded area ( 8000 m2) including: boiler room, electrical s/s, HVAC room, fire station, fuel station, mechanical workshops, guard house and mosque
Ministry of defense
General buildings / Airports
Cairo – Ismailia Desert Road
Ended in 2000
the Club lies on a total area of 10.5 acres. It consists of: • Social events building: with a total shaded area of 2000 m2 (it contains: restaurants, foyers, celebration hall, library, cinema, entertaining halls, table tennis (ping pong) hall, billiard hall, administrative rooms, kitchen area and ...etc) • Gymnasium and squash building • Two swimming pools: main pool and children’s pool with their facilities (cloak rooms, sauna, toilets, clinic,pump room ……etc). • Playground area: That contains (football court with track and grandstand, several playgrounds, tennis courts, two cloak-rooms and green areas covered with variety of plants). • The Project includes all electromechanical works, Infrastructure, and Landscape works.
Egypt insurance company
General buildings / Clubs
6th of October City
Ended in 2007
The Club lies on a total area of 60.9 acres. It consists of: • Swimming pools complex with a total shaded area of 14,000 m2, it consists of five swimming pools: diving pool ( water polo and water ballet), Olympic pool (25 x 50 x 2.1m), which includes ten lanes with start blocks, touch pads, lane rope and video cameras), entertainment pool, Jacuzzi pool and children pool. In addition, there are lounges, restaurants, entertaining spaces, children facilities, sauna, gymnasium,toilets, kitchen and electromechanical room. • Social building with a total shaded area of 3,000 m2, it contains lounges, main restaurant, conference hall, cinema, activities room, billiard room, bridge room, chess room, backgammon room, computer room, and library. • Shooting services building with a total shaded area of 1,750 m2, it contains lounges, restaurant, cafeteria, kitchen, offices, and toilets. • Shooting courts (four buildings) each with area 125 m2 /court. • Fences & gates. • Infrastructure & Electromechanical works.
Owner / Egypt Shooting Club- Consultant / Sabour Office
General buildings / Clubs
The 6th of October City
Ended in 2008
Construction of high standard educational Center consists of 75 classes - 50 m2 each- including different facilities, (court yards,theater, dinning hall, swimming pool,gymnasium, .....etc).
ELEGANT Education Home
General buildings / Educational
The 5th District
Ended in 2002
It's a building for student exams, which can accommodate 6,000 students. It can be used for many other purposes during the school year. The project consists of: - 1. ground floor and four typical floors with a shaded area of about 28,000 m2 2. area halls of about 20,000 m 2, and a height of 5.5 meters per floor. 3. The service area of about 8,000 rooms m 2, and consists of bathrooms, supervisors rooms, first aid, stores, and ventilation machines, three of the main stairs and two emergency exit stairs. The work includes the scope of work Electromechanical Site Coordination
Owner / Helwan University - Consultant / Dr.Gazaly
General buildings / educational
Helwan city
Ended in 2005
The Project execution Techniques are slip form and heavy lifting, pre-stressing cable and heavy shoring systems. • The main sectors of the project are: 1 - The main plant 1,000,000 m2 2 - Limestone quarry 771,000 m2 3 - Clay quarry 1,028,000 m2 4 - Electricity station 40,000 m2 5 - Housing 202,500 m2 • The project contains: - Total concrete works of 50,000 m3. - Total steel structure works of 800 tons. • The plant consists of: 1- Limestone crusher. 2 - Clay crusher. 3 - Limestone pre-blending storage yard. 4 - Auxiliary material pre-homogenization storage yard. 5 - 4 Raw material proportioning stations 20 m height. 6 - Raw mill grinding. 7 - Raw homogenization silo. 8 - Raw meal feed system. 9 - By Pass System. 10 - Pre-heater & -Cyclones building with 500 m2 area & 96 m height. This building has supplementary as follows: a) Conditioning tower. b) Exhaust gas treatment building. c) Steel chimney with 100 m height. 11 - Rotary kiln with 4.25 m diameter and 60 m height. 12 - Grate Cooler with 1,200 m2 area and 18 m height. 13 - 2 Clinker Silos: 1st: 22 m diameter & 41 m height. 2nd: 8m diameter & 32 m height. 14 - 2 Cement grinding proportioning Silos with 8 m diameter & 20 m height. 15 - Gypsum and mixture Crushing. 16 - Cement mill with 1,400 m2 area & 34 m height. 17 - 2 Cement Silos with 18 m diameter & 35 m height. 18 - Cement packing with 1,200 m2 area & 19 m height. 19 - Fuel Oil Tanks, which Consist of: a) Main Tank 4,000 Tons. b) Daily Tank 250 Tons. c) Daily Tank 100 Tons. 20 - Main water tank 4,000 m3 volume, 30 m diam- eter, and 6m height. 21 - Water Tower 150 m3 volume, and 35 m height. 22 - Water Treatment Plant. 23 - Sewerage Plant. 24 - Plant Roads 6 km. 25 - Main Access Road to site 3 km. 26 - Main Substation (220 / 11 k.v) with an area of 22000 m2. 27 - Transporting belts with length of 2,000 m. 28 - Auxiliary Buildings ( laboratory, Electrical rooms, Control stations, Compressed air stations, storages, Electrical workshops, Mechanical workshops, Administrative Buildings, Changing rooms, and firefighting station). 29 - Utilities (Fuel oil system, Compressed air system, water system [Cooling – firefighting – drinking], and sewage system). 30 - Housing. 31 - Fence, Gates & security building.
Medcom Group
Industerial Buildings / Cement
Aswan City
Ended in 2008
Construction of civil works for Sinai White Cement Plant ( 1000 ton/day ). • The project was executed with slip technique, prestressing cable and heavy shoring systems. • The project is comprised of cement silo, clinker silo , limestone silo and other different structures for cement mill, packing plant, cooler, raw material intake, electrical , and other auxiliary buildings
Sinai Cement
Industerial buildings / Cement
El-Areesh
Ended in 2001
Construction of the biggest press center in the Middle East with an area of 60000 m2, It Consists of : • Heavy steel structure covering an area of 2600 m2 with a height of 24 m and clear span of 27m. • Heavy reinforced concrete structures, designed as huge portal frames with wide spans, for commercial press, mail room , stores and services .....etc. ( clear hights up to 9.5 m) with a total shaded area of 40 000 m2. • V.l.P. building is a high standard building including chairman office, meeting rooms, conference & lecture halls.... etc. • Administrative building with a total shaded area of 8000 m2. • Infrastructure and roads serving the whole press, main gates and fence.
Owner / AKHBAR EL-YOM - Consultant / Sabour Office
Industerial buildings / Press
The 6th of October city
Ended in 1998
The building is a fair face reinforced concrete structure with an area of 3,100 m2, and the height of 12 m representing an extension of the existing working stores. • The external walls consist of pre-cast concrete panels with thickness of 45 cm, and with dimensions of 2 m width & 12.57 m height. • The project includes all electromechanical works
Abo Sultan Pharmaceutical company
Industerial buildings / Medical
Abo Sultan
منتهي في 2005
The building is RC structure that covers an area of 10,000 m2 and the height of the building is 23 m. Building No (2): Utilities Building: Total Roofed area of 2,600 m2 The building is two stories RC structure that covers an area of 1,300 m2. - A concrete structure of an area of 150 m2 will be used to locate the transformers. Building No (3): Boiler House - The building is a single storey RC structure that covers an area of 220 m2 Building No (4): Social Activities Building: Total Roofed area of 1,375 m2 - The building is a three storeys RC structure that covers an area of 650 m2. Building No (5): Electrical Sub-station - The building is a single storey RC structure that covers an area of 160m2. Building No (6) & (7): Gate Houses - Gate houses will be constructed of RC structure. The area of the two rooms is 120 m2. Boundary wall: The approximate length of the boundary wall is 760 m2
Industrial company for modern food industries
Industrial buildings / Food
The 6th of October city
Ended in 2007
he second phase of the existing factory consists of: • The steel structure with a height of 9 m and an area of 6,500 m2. • The electricity station is a reinforced concrete structure with a total area of 2,500 m2, which contains air conditioner equipment and a generator with a height of 7 m. • The fair face concrete tunnels which are closed for the manufacturing paths with a height of 2 m, width of 1 m and a length of 1,100 L.M.
Setcore Spinning Company.
Industrial buildings / Spinning
Borg El Arab - Alexandria
Ended in 2005
Construction works based on core and shell methodology for 9 residential blocks with total shaded area of 94,000 m2, each block consists of two buildings in Phase I Zone B and fences
PALM HILLS DEVELOPMENTS
Housing / Compounds
New Cairo
Ended in 2020
Garden heights (Cluster 5) :
• Construction works for 94 units (16 blocks) core and shell
• Fences
• Landscape
Garden heights (Cluster 8) :
• Construction works for 35 villas core and shell
• Fences
• Datacenter building
HYDE-PARK Properties For Development
Housing / Compunds
The New Cairo
Started in 2017
Construction and finishing of 17 villas (4th stage)
• Fences and the second Gate.
• Landscape Works for phase 1 and 4
Housing and Development Bank
Housing / Compounds
The New Cairo
Ended in 2015
Execution of 51 Villas on the basis of core and shell in addition to finishing works of another 21 Villas that include internal plastering ,external finishes , metal works , roof insulations and electrical cable feeders at zone D work
Six of October Development & Investment Company (SODIC)
Housing / Compunds
The 6th of October
ُىيثي هى 2014
A residential project comprised of 165 buildings ( 3960 apartments), each building includes a ground floor and 5 typical floors with a total shaded area of 300000 m2 completed with infrastructure and roads
Housing Fund of the Armed Forces
Housing / Compunds
The Nasr City
Ended in 2000
Phase VI- Block 5 (20 Buildings) :
• Construction of 20 buildings
• External finishing
Phase VIII- Block 3 (8 Buildings) :
• Construction of 20 buildings
• External finishing
Sixth of October development & investment (Sodic)
Housing / Bulidings
The 6th Of October
Ended in 2016
Phase I -Zone (A&B):
• Construction of 193 Villas
• External finishing
• Electromechanical works
Phase I - Zone (C):
• Construction of 46 Villas
• Finishing Works
SOREAL for Real Estate Investment S.A.E
Housing / Compounds
New Cairo
Zone (A&B) Ended in 2018
Garden heights - New Cairo (Cluster 6) :
- Construction of Semi-Finished Townhouses (60 Units) distributed on 10 blocks. The Blocks shall be based on Core and shell methodology, each Townhouse id (G+1) with external façade
- Internal finishes
- Site facilities
- Fence and gates
Garden heights - Interior finishing (Cluster 6) :
- Interior finishing works of 60 Units Townhouses
Garden heights - Landscape (Cluster 6) :
Landscape works (softscape and hardscape)
HYDE-PARK Properties For Development
Housing / Compunds
The New Cairo
Ended in 2015
the Executed works include: • 1,128 rooms, 54 suites, 104 chalets, 75 villas, 8 swimming pools, 2 water tanks 3,000 m3 each,5 irrigation tanks 350 m3 each, 3 restaurants on a total shaded area of 3,000 m2, 3 receptions on a total shaded area of 2,300 m2, and health & fitness center. • The project includes retaining walls and all Infrastructure, and Landscape works. • 292 renovation rooms, 26 villas (each villa consists of 12 rooms, 12 bathrooms, and a studio), disco building, restaurants, 80 shops, 2 irrigation tanks, health club, and a culvert
Owner / Sinai Tor. Development Co.- Consultant / Dr.Gamal
Hotels & Resorts
Sharm El-Sheikh
Ended in 1997
Olympic Village in Maadi: • Hotel Building (Total shaded area 17 000 m2) Lodging sector includes basement, ground floor, mezzanine and 5 typical floors for accommodation (350 beds). Administrative sector includes ground floor, restaurant, mosque, conference room, theater and library. • General layout includes electromechanical works, swimming pool, football stadium and recreational area
Ministry of communications
Hotels & Resorts
El- Maadi
Ended in 2001
Infrastructure for the Taj Sultan entire business, including water and fire networks and sewage and irrigation, electricity, communication and internal roads
Madinet Nasr For Housing & Development
Infra-Structure
Madinet Nasr
Ended in 2019
Infrastructure works including the (fire-fighting- drinking water - electricity - sewage - irrigation ) networks for the villas Irrigation and water tanks and chlorine Artificial lake and fountains, pumps and equipment and pumping stations Swimming pools
The Financial Affairs of the Armed Forces
General buildings- Infrastructure
New Administrative Capital
Works of the main lift stations and Connectivity on the expulsion and the regression lines emerging.
National Authority of Drinking Water Sanitation
Infrastructure / Pumping station
New Qena
Ended in 2014
Infrastructure work including the followings:-
1- Water Tanks
2-Pumping Stations
3-Pipe networks/Roads
4-Electrical Networks & Substations
5-HVAC(8 Chillers 500 TR each with all necessary equipment (pumps, cooling towers ...etc.)
Ministry of Telecommunication
Infrastructure / Stations
Smart Village
Ended in 2002
Development of existing Aerated Oxidation basins of Badr's waste water treatment to accommodate discharges 40000 m3/day (2 maturing lakes, 2 frequented lakes, 1 Anaerobic lake and 3 drainage and collection lakes) :
- Leveling and operation of frequented lakes dam exit
- Engineering, Supply and installation of distribution chambers
- Gates' supply and installation
- Supply and installation of gates covers
- U.P.V.C Pipes supply and installation
- Pumps' supply and installation
- Supplying of the Materials required for filters layers and construction
National Authority of Drinking water and Sanitation
Infrastructure
Badr City
Ended in 2013
Irrigation system implementation
- U.P.V.C Pipes supply and installation
- G.R.C covers supply and installation
National Authority of Drinking water and Sanitation
Infrastructure
New Beni Suef City
District cooling plant of capacity 4,000 TR
• Engineering & Electromechanical
• Supply of Cooling Towers, Chilled Water Pumps,
Piping, Fittings & Valves and other Plant auxiliaries.
• Civil Works
• Electromechanical Installation of Chillers, Cooling Towers, Pumps, & Plant Auxiliaries.
• Commissioning for the Plant equipment
Military Works Department - Armed Forces Engineering Authority
Electro Mechanical
Galala City
Ended in 2020
District cooling plant (10,000 TR). Services included:
• Engineering for Civil & Electromechanical
• Supply of Chilled Water Pumps, Piping, Fittings & Valves and other Plant Auxiliaries.
• Electromechanical Installation of Chillers, Cooling Towers, Pumps & Plant Auxiliaries.
• Commissioning for the Plant Equipment
Military Works Department - Armed Forces Engineering Authority
Electro Mechanical
Armed Forces
Ended in 2020
The Landscape of Blocks Nos 2&3 and the park area , which includes the irregation , Lighting Networks and the landscape
Madinet Nasr For Housing & Development
Landscape
Madinet Nasr
new entertainment park located in the center of Cairo has a total area of 336,000 m2. The park consists of green areas, roads, theater, entertaining areas, artificial lake, lake side café, restaurant and many other facilities. The different levels and layers of the park included in the project could be considered as the real enhancement of the architectural and engineering design.
The GEOTECHNICAL works of the project within an area of around 280,000 m2 are leveling and grading of surface, clay lining and forming the final designed surfaces and levels of the park. The designed layers of the park are the clay lining above the sub-grade surface (as an impervious layer) then protection layer then planting soil (in the green areas) or structural fill (in road areas).
700,000 m3 of excavation and residuals were cleared from the site.
The GEOMEMBRANE works within an area of 56,000 m2 consists of protection layers of sloop green areas and lake (mainly HDPE and clay lining as impervious layers) with thickness from 0.5 mm up to 2 mm.
The HARDESCAPE works covered the different kind of materials such as tiles, stones, marbles, granite, curbstones, and blocks as final surfaces of roads, theaters, pergolas, stairways, seats, corridors, bathrooms and the fountains
Agha Khan culture service
Landscape
Cairo
Ended in 2004